|
Installation
10. What needs
to be accomplished after the VSAT has meet alignment criteria and
a confirmation number has been generated?
The final step in the commission
process is obtaining the Signal-to-Noise Ration (SNR) and ensuring
all the bolts on the antenna are tightened to the proper torque
settings.
Additionally, ensure you have applied
MoCap or some other form of sealing compound to the elevation locking
bolts and the clamp bolts. This will greatly assist StarBand in
determining if unauthorized tampering of the elevation and/or azimuth
has occurred and after the initial installation. This could save
you time and money if a maintenance dispatch is required to repeak
the antenna.
|